STRATA — The Civil Engineering PlatformSTRATA — The Civil Engineering PlatformTHE CIVIL ENGINEERING PLATFORM

Every calculation
a civil engineer
needs. One platform.

STRATA runs real engineering math — Vesic bearing capacity, AISC steel checks, ACI column design, Manning's flow, Rankine walls — with every formula shown, every value substituted, and a code reference on every check. No black boxes. The way a PE would sign off on it.

Geotechnical · Structural · Water · Transportation · Construction

30Working calculators
4Bearing methods compared
100%Formulas shown, values substituted
8Codes referenced on checks
SEC. 05

Strata News

The civil engineering briefing — major projects, codes & policy, materials and research. Every story sourced, dated, and linked.

STRATA NEWS CHANNEL Updated November 14, 2026 · Stories below were published by the sources named on each card — Strata summarizes, the source reports.
HEADLINES
Top Story · Infrastructure Grades

Indiana infrastructure earns D+ in ASCE 2026 state report card

The American Society of Civil Engineers' 2026 state report card gives Indiana's infrastructure an overall grade of D+. The state's transportation network scores above the national average, but the report warns that a seven-month gas tax holiday is draining the revenue that pays for aging roads and bridges. ASCE's prescription: more funding for local roads and bridges, bigger investment in flood management, and modernized water and wastewater systems.

Source: FOX59 / CBS4 Indianapolis · Published November 13, 2026 · Watch the story at FOX59
Bridges · Historic Landmarks

Route 66 Bridgeport Bridge dedicated as ASCE National Historic Civil Engineering Landmark

Oklahoma's Route 66 Bridgeport Bridge was formally dedicated as a National Historic Civil Engineering Landmark on November 12, 2026, recognizing the 1930s truss bridge as a landmark of American bridge engineering.

Oklahoma Department of Transportation · Nov 12, 2026 · Read the story at Oklahoma DOT
Research · Structural Health Monitoring

London wants citizen smartphones to monitor building health

With 583 tall buildings planned over the next decade, London faces a shortage of structural health monitoring experts. Researchers are now testing whether the sensors already in smartphones and wearables can form a continuous, affordable monitoring network for the city's buildings.

ASCE Civil Engineering magazine · By Kayt Sukel · Nov/Dec 2026 · Read the story at ASCE
Codes & Standards · Waterfront

Updated seismic design standard for piers and wharves — ASCE/COPRI 61-26 — now available

The updated standard reflects the current practice of seismic design of piers and wharves, including a new chapter on the seismic design of steel sheet pile bulkheads. ASCE/COPRI 61-26 updates and replaces the previous standard, ASCE/COPRI 61-14.

ASCE · November 2026 · Get the standard at ASCE
Business of Engineering

ENR Top 500 design firms earned $158.7 billion in 2025, up 7.4%

Engineering News-Record reports the Top 500 U.S. design firms earned $158.7 billion in 2025, up 7.4 percent. Telecommunications design led the way, up about 31 percent on data-center demand, with power up nearly 15 percent and water supply up almost 10 percent — against a national infrastructure grade of C and a $3.7 trillion gap between what is planned and what is needed.

Engineering News-Record · November 2026 · Read the story at ENR

Listen to the briefing

The November 14, 2026 briefing as a narrated audio recording — press play. The complete written transcript is beside it; the audio and the text are the same words.

Briefing transcript — November 14, 2026

Welcome to Strata News. Your briefing for civil engineers, for the week of November fourteenth, twenty twenty-six.

First, Indiana's infrastructure earned a D-plus in the American Society of Civil Engineers' twenty-twenty-six state report card. The state's transportation network actually scores above the national average, but the report warns that a seven-month gas tax holiday is draining the revenue that pays for aging roads and bridges. The Society's prescription: more funding for local roads and bridges, bigger investment in flood management, and modernized water and wastewater systems.

In Oklahoma, a piece of history got its plaque. The Route 66 Bridgeport Bridge was formally dedicated as a National Historic Civil Engineering Landmark on November twelfth, recognizing the nineteen-thirties truss bridge as a landmark of American bridge engineering.

Across the Atlantic, London is looking to the phones in everyone's pockets to watch its buildings. With five hundred eighty-three tall buildings planned over the next decade, the city faces a shortage of structural health monitoring experts. Researchers are now testing whether the sensors already in smartphones and wearables can form a continuous, affordable monitoring network for the city.

And for engineers working on the waterfront: the updated seismic design standard for piers and wharves, A-S-C-E COPRI sixty-one, twenty-twenty-six edition, is now available from ASCE.

Finally, the business of engineering keeps growing. Engineering News-Record reports the top five hundred U.S. design firms earned a hundred fifty-eight point seven billion dollars in twenty-twenty-five, up seven point four percent. Telecommunications design led the way, up thirty-one percent, driven by data centers, with power up nearly fifteen percent and water supply up almost ten. The backdrop is still the same: the nation earned a C on the twenty-twenty-five infrastructure report card, with a three point seven trillion dollar gap between what's planned and what's needed.

That's your Strata briefing. Every story is sourced on the page. Open any of them to read the full report.

SEC. 01

Calculators

Pick a tool. Results update as you type — every step is shown underneath.

SEC. 05

Strata News

The civil engineering briefing — major projects, codes & policy, materials and research. Every story sourced, dated, and linked.

STRATA NEWS CHANNEL Updated November 14, 2026 · Stories below were published by the sources named on each card — Strata summarizes, the source reports.
HEADLINES
Top Story · Infrastructure Grades

Indiana infrastructure earns D+ in ASCE 2026 state report card

The American Society of Civil Engineers' 2026 state report card gives Indiana's infrastructure an overall grade of D+. The state's transportation network scores above the national average, but the report warns that a seven-month gas tax holiday is draining the revenue that pays for aging roads and bridges. ASCE's prescription: more funding for local roads and bridges, bigger investment in flood management, and modernized water and wastewater systems.

Source: FOX59 / CBS4 Indianapolis · Published November 13, 2026 · Watch the story at FOX59
Bridges · Historic Landmarks

Route 66 Bridgeport Bridge dedicated as ASCE National Historic Civil Engineering Landmark

Oklahoma's Route 66 Bridgeport Bridge was formally dedicated as a National Historic Civil Engineering Landmark on November 12, 2026, recognizing the 1930s truss bridge as a landmark of American bridge engineering.

Oklahoma Department of Transportation · Nov 12, 2026 · Read the story at Oklahoma DOT
Research · Structural Health Monitoring

London wants citizen smartphones to monitor building health

With 583 tall buildings planned over the next decade, London faces a shortage of structural health monitoring experts. Researchers are now testing whether the sensors already in smartphones and wearables can form a continuous, affordable monitoring network for the city's buildings.

ASCE Civil Engineering magazine · By Kayt Sukel · Nov/Dec 2026 · Read the story at ASCE
Codes & Standards · Waterfront

Updated seismic design standard for piers and wharves — ASCE/COPRI 61-26 — now available

The updated standard reflects the current practice of seismic design of piers and wharves, including a new chapter on the seismic design of steel sheet pile bulkheads. ASCE/COPRI 61-26 updates and replaces the previous standard, ASCE/COPRI 61-14.

ASCE · November 2026 · Get the standard at ASCE
Business of Engineering

ENR Top 500 design firms earned $158.7 billion in 2025, up 7.4%

Engineering News-Record reports the Top 500 U.S. design firms earned $158.7 billion in 2025, up 7.4 percent. Telecommunications design led the way, up about 31 percent on data-center demand, with power up nearly 15 percent and water supply up almost 10 percent — against a national infrastructure grade of C and a $3.7 trillion gap between what is planned and what is needed.

Engineering News-Record · November 2026 · Read the story at ENR

Listen to the briefing

The November 14, 2026 briefing as a narrated audio recording — press play. The complete written transcript is beside it; the audio and the text are the same words.

Briefing transcript — November 14, 2026

Welcome to Strata News. Your briefing for civil engineers, for the week of November fourteenth, twenty twenty-six.

First, Indiana's infrastructure earned a D-plus in the American Society of Civil Engineers' twenty-twenty-six state report card. The state's transportation network actually scores above the national average, but the report warns that a seven-month gas tax holiday is draining the revenue that pays for aging roads and bridges. The Society's prescription: more funding for local roads and bridges, bigger investment in flood management, and modernized water and wastewater systems.

In Oklahoma, a piece of history got its plaque. The Route 66 Bridgeport Bridge was formally dedicated as a National Historic Civil Engineering Landmark on November twelfth, recognizing the nineteen-thirties truss bridge as a landmark of American bridge engineering.

Across the Atlantic, London is looking to the phones in everyone's pockets to watch its buildings. With five hundred eighty-three tall buildings planned over the next decade, the city faces a shortage of structural health monitoring experts. Researchers are now testing whether the sensors already in smartphones and wearables can form a continuous, affordable monitoring network for the city.

And for engineers working on the waterfront: the updated seismic design standard for piers and wharves, A-S-C-E COPRI sixty-one, twenty-twenty-six edition, is now available from ASCE.

Finally, the business of engineering keeps growing. Engineering News-Record reports the top five hundred U.S. design firms earned a hundred fifty-eight point seven billion dollars in twenty-twenty-five, up seven point four percent. Telecommunications design led the way, up thirty-one percent, driven by data centers, with power up nearly fifteen percent and water supply up almost ten. The backdrop is still the same: the nation earned a C on the twenty-twenty-five infrastructure report card, with a three point seven trillion dollar gap between what's planned and what's needed.

That's your Strata briefing. Every story is sourced on the page. Open any of them to read the full report.

SEC. 04

Reference Library

The handbook tables the calculators draw on — searchable, sourced, with limits stated. Typical values are labeled typical: verify by testing before design use.

AISC W-Shape Properties

Source: AISC Shapes Database v15.0 — AISC's official database, the data behind Table 1-1 of the Steel Construction Manual (15th ed.). This is the COMPLETE W-shape family: all 283 shapes, downloaded from the official database for this build. The steel beam tool's shape list is drawn from this same database (its seven original shapes keep their Manual print values).

Reinforcing Bars — ASTM A615

Source: ASTM A615 / CRSI standard bar table. Perimeter = π × diameter (development and crack-control calculations). #14 and #18 bars are generally restricted from use as flexural reinforcement in beams per ACI 318 practice notes.

Concrete Material Properties

Source: ACI 318-19 §19.2.2 (Ec = 57,000√f′c for normal-weight concrete, wc = 145 pcf) and §19.2.3 (fr = 7.5λ√f′c). Modulus values are code estimates — measured Ec from cylinder tests governs where stiffness is critical.

Soil Properties by Type — TYPICAL RANGES

Source: typical-value ranges compiled from Das, Principles of Foundation Engineering, and NAVFAC DM 7.01. These are preliminary-design values only. Soil properties vary by site more than any other input on this platform — final design values come from the project geotechnical investigation and laboratory testing.

Manning’s n by Channel Material

Source: Chow, Open-Channel Hydraulics (1959), Table 5-6 — the standard n-value compilation. Select n for the channel’s aged, maintained condition, not its day-one condition.

Rational Method Runoff Coefficients C

Source: standard C ranges of ASCE / FHWA drainage practice (2- to 10-year frequency basis). C rises with storm frequency and antecedent moisture — many manuals apply a frequency factor Cf up to 1.25 for the 100-year event, capped at C = 1.0.

HSS Square — Selected Shapes

SELECTED common sizes from the HSS square family of AISC Shapes Database v15.0 / SCM 15th ed. Table 1-11. t is the design wall thickness (0.93 × nominal, per AISC 360 §B4.2 for ERW HSS). Honest limit: the A, weight, I and S values in this table are computed from that design wall thickness with sharp-corner section geometry, so they are close preliminary-sizing approximations (generally within a few percent) — they are NOT transcribed database values, because the published properties also account for corner radii. Use the exact AISC Shapes Database v15.0 values for final design.

HSS Rectangular — Selected Shapes

SELECTED common sizes from the HSS rectangular family of AISC Shapes Database v15.0 / SCM 15th ed. Table 1-12. X-X is the strong axis (long dimension vertical). t is the design wall thickness (0.93 × nominal). Honest limit: as in the square table above, the A, weight, I and S values here are computed from the design wall thickness with sharp-corner geometry — close preliminary-sizing approximations, NOT transcribed database values (published values account for corner radii). Use the exact AISC Shapes Database v15.0 values for final design.

Channels (C-Shapes) — Selected Shapes

Source: AISC Shapes Database v15.0, SCM 15th ed. Table 1-5 family — SELECTED common sizes, not the complete channel family. Verify against the current AISC database before final design.

Angles (L-Shapes) — Selected Shapes

Source: AISC Shapes Database v15.0, SCM 15th ed. Table 1-7 family — SELECTED common sizes. Equal-leg angles: Ix = Iy and Sx = Sy. Verify against the current AISC database before final design.

SEC. 03

Code Library

Every check in STRATA traces back to a published standard. These are the ones in the engine.

Vesic Bearing Capacity

VESIC 1973 · 1975

General shear bearing-capacity equation with shape, depth, and inclination factors. Nγ per Das or Vesic, selectable in the tool.

AISC 360

SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS

Flexure (Ch. F, Mn = Zx·Fy for fully braced compact shapes) and shear (Ch. G, Vn = 0.6·Fy·Aw·Cv).

ACI 318

BUILDING CODE FOR STRUCTURAL CONCRETE

Axial strength of tied and spiral columns (§22.4), strength-reduction factors φ = 0.65 / 0.75 (§21.2), reinforcement limits 1%–8% (§10.6).

ASCE 7

MINIMUM DESIGN LOADS

Load combinations and serviceability context behind the factored loads you enter in the structural tools.

IBC

INTERNATIONAL BUILDING CODE

Allowable bearing pressures, foundation requirements (Ch. 18), and the FS conventions used in the geotechnical checks.

Manning's Equation

OPEN-CHANNEL HYDRAULICS

Uniform-flow equation for rectangular, trapezoidal, and circular sections, SI and US forms, with velocity screening.

Rankine Earth Pressure

CLASSICAL EARTH-PRESSURE THEORY

Active and passive coefficients Ka = tan²(45° − φ/2), Kp = tan²(45° + φ/2), with overturning, sliding, and bearing stability checks.

Rational Method

STORMWATER PRACTICE · Q = C·i·A

Peak runoff for small catchments with land-use runoff coefficients, US (cfs) and SI (m³/s) unit forms.

Code Provisions & Capacity Tables

The provision tables the calculators check against — load combinations, bolt capacities, and development lengths, with sources and limits stated.

ASCE 7-22 Load Combinations

Source: ASCE/SEI 7-22, Minimum Design Loads and Associated Criteria for Buildings and Other Structures — §2.3 (LRFD) and §2.4 (ASD). Symbols per §2.2 (D dead, L live, Lr roof live, S snow, R rain, W wind, E seismic). Limits: E includes the horizontal and vertical seismic effects of §12.4 (E = Eh ± 0.2·SDS·D in LRFD combination 5 and 7 in the form this platform's structural tools expect the designer to pre-combine); flood loads F and H loads, where applicable, enter combinations 2, 3, 4 and their ASD counterparts per §2.3.1/§2.4.1 — they are not carried in the rows below. Companions and counteracting combinations still govern whenever W or E can reduce the effect.

AISC Bolt Shear Capacities — Groups A (A325) & B (A490)

Source: AISC 360-22 Table J3.2 and §J3.6 — nominal shear strength Rn = Fnv·Ab per shear plane, φv = 0.75 (LRFD). N = threads included in (not excluded from) the shear plane; X = threads excluded. Double shear = two shear planes through the same bolt group cross-section (e.g. a double-angle or sandwich splice). Limits: slip-critical connections are checked separately for slip resistance per §J3.8 (these rows are bearing-type strengths); long joints, eccentricity on the bolt group, and combined tension/shear (§J3.7) reduce capacity and are not in this table.

AISC Bolt Bearing & Tearout — per inch of connected-part thickness

Source: AISC 360-22 §J3.10, φ = 0.75. When deformation at the bolt hole at service load IS a design consideration, the governing strength is the smaller of tearout and bearing: Rn = 1.2·Lc·t·Fu ≤ 2.4·d·t·Fu, where Lc is the clear distance from the edge of the hole to the edge of the adjacent hole or material edge. When deformation is NOT a design consideration: Rn = 1.5·Lc·t·Fu ≤ 3.0·d·t·Fu. The rows below tabulate the BEARING cap only — φ·Rn = φ·2.4·d·t·Fu at t = 1 in (the deformation-considered cap, reached when Lc ≥ 2d) — multiply by the actual thickness in inches of the thinnest connected ply, and always check tearout with the project’s actual Lc. Minimum spacing 2⅔d (3d preferred) and minimum edge distances per Table J3.4 still apply.

ACI 318 Development Length & Lap Splices — Grade 60, normalweight, uncoated

Source: ACI 318-19 Table 25.4.2.2 (simplified ld) and §25.5.2 (lap splices: Class A = 1.0·ld, Class B = 1.3·ld; Class B is the default unless the Class A conditions of §25.5.2.1 are met over the entire splice). Tabulated ld is the FAVORABLE case in Table 25.4.2.2 — clear spacing ≥ db with clear cover ≥ db and minimum transverse reinforcement, or clear spacing ≥ 2db with clear cover ≥ db; λ = 1.0 (normalweight), ψe = 1.0 (uncoated), ψt = 1.0 (not top-cast bars with >12 in of fresh concrete below). Limits: ld ≥ 12 in always (§25.4.2.1). Other Table 25.4.2.2 cases (less spacing, cover, or confinement): multiply ld by 1.25. Top-cast bars: ×1.3 (ψt). Epoxy-coated: ×1.2 or ×1.5 (ψe per §25.4.2.4). Lightweight concrete: divide by λ = 0.75 effect — i.e. multiply by 1/0.75. The full (cb + Ktr)/db equation of §25.4.2.3 may give shorter lengths; hooked and headed terminations are §25.4.3 / §25.4.4, not this table. Compression development and mechanical splices are separate provisions.

SEC. 02

Advanced Wing

Five research-grade modules — remote sensing & hazards, ML condition assessment, foundation-model reasoning, digital twins, and multimodal NDE. Same audit bar as the calculators: real methods, cited sources, stated limits.

The research pack is one self-contained HTML document with the complete content of all five modules below — every method, formula, scoring scale, threshold, the full diagnostic decision tree, and the three prompt templates — each with its sources, assumptions, and limits, written to be handed to a researcher.

SEC. 06

My Projects

Save any of the 30 calculators with a name and notes, reload it back into its tool, or take everything out as one file.

Saved in this browser on this device only. Clearing this browser's site data deletes saved projects — export a copy to keep them. Accounts and cloud sync arrive with the non-static rebuild.

Save a calculation

Every tool above also has a “Save to My Projects” button next to its Calculation Sheet button — it brings that tool's current inputs here, ready to name. Loading a saved project restores its inputs and units exactly, including earthwork stations and the bearing-capacity unit system.

Saved projects

SEC. 07

Equation Library

The equations a civil engineer reaches for — every one with its notation, its published source, and the limits that decide when it stops applying. Search by name, symbol, or source.

SEC. 08

Handbook Library

The major manuals and handbooks behind the calculators — what each one covers in plain language, the tables and formulas engineers actually open it for, and the link to the official source. Summaries and key references only; the manuals themselves stay with their publishers.

SEC. 09

Land Development

For the people who hire the engineers: turning raw land into lots and buildings. Plain language first — what each number means for the deal — with the real engineering underneath, sourced the same way as every other Strata tool.

Every development deal turns on a handful of questions. How many lots does this land really yield? Does the zoning allow what you want to build? Will the water and sewer systems take the project — and can they deliver fire flow? How much traffic will it add? And after every cost and the profit the project has to earn, what can you actually pay for the land? The six calculators below answer those questions the way your civil engineer answers them — formula shown, source cited, limits stated — and each one prints a calculation sheet you can hand to a lender, a partner, or a city reviewer. All six also live in the main Calculators grid.

The six developer calculators

Subdivision Lot Yield

HOW MANY LOTS FIT?

Gross acreage minus streets, open space, detention, and unbuildable land, divided by lot size. The lot count and density every deal is underwritten on — computed before you pay for a concept plan.

Zoning Compliance

WILL THE CITY ALLOW IT?

Floor-area ratio, lot coverage, the buildable envelope left by setbacks, units allowed by density, and required parking — the proposal tested against the ordinance limits you enter for the parcel.

Water & Sewer Demand

WILL THE UTILITIES TAKE IT?

Average-day, maximum-day, and peak-hour water demand, plus wastewater flow with the Harmon peaking factor — the numbers behind capacity letters, tap fees, and lift-station sizing.

Needed Fire Flow — ISO

CAN THE BUILDING BE PROTECTED?

Needed fire flow by the ISO method: construction class and effective floor area set the base flow, contents adjust it, and neighboring buildings add an exposure charge. Rounded the ISO way, to the nearest 250 gpm.

Trip Generation — ITE

HOW MUCH TRAFFIC DOES IT ADD?

Daily and AM/PM peak-hour trips from the ITE Trip Generation Manual (10th ed.) for homes, apartments, office, retail, and light industrial — the starting point of every traffic impact study.

Pro Forma & Residual Land Value

WHAT CAN YOU PAY FOR THE LAND?

Revenue minus hard costs, site development, soft costs, financing, and required profit leaves the residual — the most the project can pay for the land and still work. How land is actually priced.

The development process — phase by phase

Seven phases take a project from a parcel on a map to recorded lots and finished buildings. Each phase below lists what actually gets done, what it costs when it goes wrong, and the Strata tool that does the math for that phase.

Phase 1 — Feasibility

The question: does this deal work at all? Answered in days, with screening-level numbers, before any contract money is at risk.

  • Pull the parcel data: acreage, zoning district, future land-use map, floodplain maps, utility maps.
  • Screen the lot yield — gross acres, typical deductions, lot size the market wants.
  • Run the residual: expected revenue minus all-in costs and required profit. If the residual is below the asking price, walk away or renegotiate now.
  • Ask the utility providers one question in writing: can you serve this site, and what will it cost?

What it costs to get wrong: everything downstream. A feasibility miss discovered after closing is a land write-down; discovered here, it is a declined deal.

Strata tools:

Phase 2 — Due Diligence

The question: what is actually true about this land? The contract's inspection period exists for this phase — spend it.

  • Survey — boundary / ALTA survey and topographic survey: what you own, where it sits, how it drains.
  • Geotechnical report — borings for soil bearing, expansive clay, groundwater, and pavement sections.
  • Title — title commitment read line by line: easements, restrictions, liens, and mineral reservations all survive closing.
  • Environmental — Phase I Environmental Site Assessment; wetlands and floodplain delineation where the maps suggest them.
  • Utilities — water and sewer capacity confirmed in writing, with tap fees and any off-site line extensions priced.
  • Zoning — verification letter from the jurisdiction confirming the use is allowed and listing the standards that apply.

What it costs to get wrong: the classic six-figure surprises — a pipeline easement through the middle of the best lots, expansive soils that double the foundation budget, a sewer line that needs a lift station nobody priced. Each one comes straight out of the land residual.

Strata tools: (revise the deductions with what the surveys found) (the demand figures the utility will ask for)

Phase 3 — Entitlements

The question: will the government approve it? Rezoning, platting, and site-plan approval convert a plan into a legal right to build.

  • Pre-application meeting with planning staff — hear the objections while they are still free to fix.
  • Rezoning or special-use permit if the current district does not allow the project (public hearings, neighbor notice).
  • Preliminary plat (subdivisions) or site plan (commercial / multifamily) through planning commission and council.
  • Traffic impact study where the trip generation crosses the jurisdiction's threshold.
  • Development agreement if the project needs off-site improvements, fee credits, or phased public infrastructure.

What it costs to get wrong: conditions of approval are priced in concrete — an off-site turn lane, a bigger water line, extra detention. A condition added at the hearing can cost more than the land residual holds, and every month of delay carries financing on the land.

Strata tools: (the study starts here) (re-run it with every condition priced)

Phase 4 — Design

The question: can it be built as approved? Engineers turn the entitled plan into construction documents a contractor can price and a city can permit.

  • Grading and drainage design; detention sized to the jurisdiction's release-rate rules.
  • Street design — sections, pavement thickness, and ADA-compliant sidewalks and ramps.
  • Water and sewer design to the utility's standards, including fire flow and lift stations where needed.
  • Stormwater pollution prevention plan (SWPPP) and erosion controls.
  • Cost opinion updated at each submittal — 30%, 60%, 90% — against the pro forma's site-cost line.

What it costs to get wrong: under-sized detention floods the neighbors and the project; a design that misses the pro forma's site budget by 20% erases the land residual after the land is already bought. Design changes after permitting are redesign fees plus re-review time.

Strata tools:

Phase 5 — Permitting

The question: is every approval in hand before a machine moves? Permits are the entitlement made specific to a set of drawings.

  • Construction-document approval from the city / county and the serving utilities.
  • Final plat approved and recorded — lots do not legally exist, and cannot be sold, until the plat records.
  • State stormwater general permit coverage and SWPPP in place before land disturbance.
  • Fire marshal review: fire flow, hydrant spacing, and fire-access lanes signed off.
  • Building permits for vertical construction, phase by phase.

What it costs to get wrong: starting work without a permit earns a stop-work order and a reputation with the reviewers you will face on every future project; an unrecorded plat blocks closings even if the streets are paved.

Strata tools: (the fire marshal's first question) (capacity documentation)

Phase 6 — Construction

The question: is it being built as designed, on the budget the pro forma carries? Site work first, then vertical.

  • Clearing, mass grading, and earthwork balance — cut and fill planned so dirt is moved once.
  • Underground utilities first (storm, sewer, water), tested and inspected before pavement covers them.
  • Streets, curb, and sidewalks; then lots released to builders in the platted phases.
  • Inspection and testing at every hold point — density, pressure, mandrel, concrete strength.
  • Change orders priced against the contingency line, never absorbed silently.

What it costs to get wrong: a failed density test under a finished street is a street rebuilt at the developer's cost; undocumented change orders are how a 5% contingency becomes a 15% overrun.

Strata tools:

Phase 7 — Closeout & Sell-Out

The question: does the city accept it, and does the final math match the feasibility math? Closeout is where paper, pavement, and profit all settle.

  • Final inspections and punch list; as-built (record) drawings delivered to the city and utilities.
  • Public improvements formally accepted — maintenance bond posted, warranty period starts.
  • Performance bonds released as acceptances land; retainage settled with contractors.
  • HOA or POA formed and common areas turned over with reserves documented.
  • Final accounting against the original pro forma — the lessons feed the next deal's feasibility screen.

What it costs to get wrong: unaccepted streets stay the developer's maintenance problem indefinitely, and unreleased bonds tie up credit lines the next project needs. The residual you actually earned is only known when this phase ends.

Strata tools: (final numbers vs. the original screen)

Reference tables for developers

The numbers behind the calculators, in one place. Every table is sourced, and every table states its limits — planning values screen a deal; the adopted local ordinance and the serving utility's criteria decide it.

ITE Trip Generation Rates — Common Land Uses

Source: ITE, Trip Generation Manual, 10th Edition (2017) — average weekday rates (trip ends, in + out). Limits: average rates, not fitted curves; suburban context; pass-by and internal-capture reductions are separate adjustments (ITE Trip Generation Handbook) and are not in these rates. The 11th Edition (2021) revises several values.

Land use (ITE code)Rate perDailyAM peak hrPM peak hr
Single-family detached housing (210)dwelling unit9.440.740.99
Multifamily housing, low-rise (220)dwelling unit7.320.460.56
Multifamily housing, mid-rise (221)dwelling unit5.440.360.44
General office building (710)1,000 sf GFA9.741.161.15
Shopping center (820)1,000 sf GLA37.750.943.81
General light industrial (110)1,000 sf4.960.700.63

Water & Sewer Demand Factors by Use

Source: planning-level unit factors in the ranges tabulated in Metcalf & Eddy, Wastewater Engineering: Treatment and Reuse, and in municipal water/sewer design criteria. Limits: these are feasibility values. The serving utility's adopted demand table sets tap fees and capacity reservations and always governs; irrigation, cooling, and process loads are added separately.

Land useUnitWater (gpd/unit)Wastewater (gpd/unit)Persons / unit
Single-family residentialdwelling unit3002503.0
Multifamily residentialdwelling unit2202002.2
Hotel / motelroom1801501.5
Schoolstudent25201.0

Peaking: maximum-day water demand typically 1.5× average day and peak-hour 2.5× (Ten States Standards practice); wastewater peaks follow the Harmon factor, which rises above 4 for small tributary populations.

Typical Street Sections & Right-of-Way Widths

Source: TYPICAL municipal subdivision-ordinance standards, consistent with the functional-classification guidance of the AASHTO Green Book (A Policy on Geometric Design of Highways and Streets). Limits: typical values for screening only — the adopted subdivision ordinance and thoroughfare plan for the jurisdiction set the required section, and pavement width is measured face-of-curb to face-of-curb.

Street typeRight-of-wayPavement widthWhat it carries
Local residential50 ft27–31 ftTwo travel lanes, parking one side, serves the lots fronting it
Collector60 ft36–41 ftGathers local streets, carries neighborhood traffic to arterials
Minor arterial80 ft48–60 ftFour lanes, often with a continuous turn lane or median
Major arterial100–120 ft66–84 ftFour to six lanes, divided, limited driveway access

Right-of-way is land the developer dedicates — it comes straight out of lot yield, which is why the Lot Yield calculator takes streets as its first deduction.

Typical Lot Dimensions & Setbacks

Source: TYPICAL single-family and townhome zoning-district standards from US municipal ordinances. Limits: typical ranges for feasibility screening only. Setbacks, minimum lot sizes, and coverage limits are set district by district — read them off the parcel's ordinance (and enter them in the Zoning Compliance calculator) before relying on any figure here.

ProductLot widthLot depthLot areaFront SBSide SBRear SB
Single-family, standard60 ft120 ft7,200 sf25 ft5–10 ft20 ft
Single-family, small-lot50 ft110 ft5,500 sf20 ft5 ft15 ft
Townhome20–24 ft90–100 ft1,800–2,400 sf20 ft0 ft (party wall)10 ft
Garden / patio home45 ft100 ft4,500 sf20 ft0–5 ft (zero-lot-line)10 ft
SEC. 10

Water Towers

Elevated water storage, end to end: the structure that holds the tank up, the hydraulics of the water inside it, and the foundations under its legs — each with a calculator built to the same standard as every other Strata tool.

An elevated tank is three engineering problems stacked on top of each other. The tank and its support tower must stand up to wind and earthquake loads (AWWA D100, ASCE 7). The water inside must store enough volume, deliver enough pressure, and hold a fire reserve (AWWA M42). And every pound of it — a gallon of water weighs 8.34 lb, so a 250,000-gallon tank carries over a million pounds of water alone — lands on a handful of leg footings. The three calculators below work those three problems in order, and each one also lives in the main Calculators grid.

The three water tower calculators

Elevated Tank — Structural Design

WIND + SEISMIC · LEGS & BRACING

Wind load on the tank and support tower by ASCE 7 velocity pressure, seismic base shear by ASCE 7 Chapter 15 for nonbuilding structures, the overturning moment each one drives, and the leg axial forces and diagonal-brace forces that follow — checked against the capacities you enter.

Water Tower — Flow & Hydraulics

STORAGE · HEAD · FILL & DRAIN · FIRE FLOW

Storage volume for cylindrical, spherical, and cone-bottom tanks, usable storage above the outlet, static head and pressure at the ground and at a service elevation, fill time, gravity drain time through the outlet, and how long the usable storage can sustain a fire flow.

Water Tower — Foundation

LEG FOOTINGS · BEARING · STABILITY · ANCHORS

Individual leg footings and a combined mat checked the geotechnical way: bearing pressure with eccentricity, overturning and sliding factors of safety, uplift, and the anchor-bolt tension left after the footing and soil weights resist it.

How an elevated tank works

The idea is older than the electric pump grid it serves: lift the water once, and gravity does the distribution work forever after. Four ideas run the whole structure.

Storage — the tank is the system's battery

A water system must meet its worst hour, not its average hour. Pumps and treatment plants are sized near the average-to-maximum-day rate; the elevated tank stores the difference. It fills at night when demand is low and drains during the morning and evening peaks — that swing volume is called equalizing (or operating) storage. Below it sits the fire reserve, held for the largest fire the system must fight, and below that an emergency reserve for a pump outage or a main break. AWWA Manual M42 organizes total storage into exactly these components — equalizing, fire, and emergency — and the usable-storage line in the Flow & Hydraulics calculator is where the fire and emergency reserves live: water below the outlet invert is dead storage and can never reach the system by gravity.

Pressure head — elevation is pressure

Water weighs 62.4 lb per cubic foot, so every foot of elevation is worth 62.4 / 144 = 0.433 psi at the point below it. A tank whose water surface sits 130 ft above a neighborhood delivers about 56 psi there with no pump running — which is why distribution systems target a tank overflow elevation that holds roughly 40–80 psi across the service area: high enough for fixtures and fire hoses, low enough not to burst aging mains at the bottom of the hill. The pressure at any tap is set by one number — the difference between the water surface in the tank and the tap. When the tank drains 20 ft over a peak evening, every tap in town loses about 8.7 psi with it; that daily swing is the visible signature of equalizing storage at work.

Why elevation matters — and what it costs

Elevation buys three things. First, pressure without energy: gravity distribution never loses power in a blackout, which is why elevated storage is the backbone of fire protection. Second, fire flow on demand: a hydrant draws down stored water at rates no pump station matches economically — thousands of gallons per minute for hours. Third, surge relief: the open water surface absorbs pressure transients that would otherwise hammer the mains. The cost is structural. Every foot of height raises the wind overturning moment roughly with the square of the exposed geometry's lever arm, lengthens the seismic period, and concentrates the entire weight of tank and water onto a ring of legs and footings. That trade — hydraulics wants height, structures pays for it — is the whole design problem, and it is why this section carries a structural and a foundation calculator next to the hydraulics one.

The parts of the structure

  • Tank (vessel) — the welded steel container (AWWA D100) or factory-coated bolted steel container (AWWA D103): cylindrical shell, spheroid, or sphere, with a roof, an overflow pipe, and a vent. It carries the water load and its own wind and seismic forces.
  • Riser pipe — the large central pipe that fills and drains the tank; in single-pedestal designs it is also a structural column. In cold climates it is the part that freezes first and gets insulation or circulation.
  • Support tower — the legs (columns) and horizontal/diagonal bracing that carry the tank. The bracing, not the legs, resists most of the lateral load: wind and seismic shear travels down the diagonals as axial force.
  • Balcony, ladders & access — the roof hatch, interior and exterior ladders with fall protection, and the walkway that let inspectors and painters reach every surface — a tank is recoated several times in its life.
  • Foundation — one footing per leg, a ring wall, or a full mat, with anchor bolts tying the legs down against uplift. On the leeward side the footings see the tank's weight plus overturning compression; on the windward side they can see net uplift.
  • Appurtenances — aviation obstruction lighting where the FAA requires it, cathodic protection against interior corrosion (AWWA D104), altitude valves and level controls, and the coating system inside and out (AWWA D102) that decides how long the steel lasts.

Reference tables — water towers

The numbers behind the calculators. Every table is sourced and states its limits — typical dimensions screen a concept; the fabricator's standard designs and the adopted codes decide the real structure.

Typical Elevated Tank Capacities & Dimensions

Source: TYPICAL ranges for single-pedestal and multi-leg elevated tanks of the sizes catalogued in AWWA M42, Steel Water Storage Tanks, and major fabricators' standard lines. Limits: typical planning ranges, not standard designs — for a given capacity a spheroid, a sphere, and a cylinder-on-tower differ in every dimension, and support height is set by the pressure the system needs (see the guide above), not by the tank. Volumes check by geometry: a 60 ft diameter × 24 ft deep cylinder holds about 508,000 gal.

Nominal capacityTank diameterTank depth / heightTypical support heightCommon forms
50,000 gal24–28 ft12–16 ft75–125 ftPedestal spheroid, small multi-leg
100,000 gal30–36 ft16–20 ft75–150 ftPedestal spheroid, multi-leg cylinder
250,000 gal42–50 ft20–26 ft75–150 ftMulti-leg cylinder, fluted column
500,000 gal56–66 ft24–32 ft75–150 ftMulti-leg cylinder, composite pedestal
1,000,000 gal74–86 ft28–38 ft75–150 ftComposite pedestal, multi-leg
2,000,000 gal100–120 ft32–44 ft75–150 ftComposite pedestal, concrete pedestal

Support height is the head the system buys: ground-to-overflow elevations cluster where the pressure math of the guide puts them, roughly 100–180 ft of head over the service area for 45–80 psi.

AWWA Standards — Which Standard Governs Which Part

Source: AWWA (American Water Works Association) standards catalogue. Limits: the edition adopted by the project specification governs — AWWA revises these standards on a multi-year cycle, and state drinking-water rules adopt editions by reference. This table assigns scope; it does not reproduce the standards' requirements.

StandardTitleWhat it governs on the tower
AWWA D100Welded Carbon Steel Tanks for Water StorageThe welded tank itself: shell, roof, and support design loads, materials, welding, erection, and inspection — the structural standard the Structural calculator follows.
AWWA D103Factory-Coated Bolted Carbon Steel Tanks for Water StorageThe bolted alternative to D100: factory-coated panels, field-bolted erection, its own design and foundation-interface rules.
AWWA D102Coating Steel Water-Storage TanksInterior and exterior coating systems — surface preparation, coating schedules, and inspection; the system that sets recoating intervals.
AWWA D104Automatically Controlled, Impressed-Current Cathodic Protection for the Interior of Steel Water TanksCathodic protection of the submerged interior steel — anodes, rectifiers, and monitoring that work alongside the D102 coating.
AWWA M42Manual of Water Supply Practices — Steel Water Storage TanksThe planning and operations manual: storage components (equalizing, fire, emergency), siting, sizing, inspection, and maintenance — the reference behind the Flow & Hydraulics calculator.

Wind & Seismic Design Criteria for Tanks

Source: ASCE/SEI 7 (Minimum Design Loads) as invoked by AWWA D100 for the loads a tank and its support must resist. Limits: criteria summary for screening — the adopted ASCE 7 edition, the site-specific wind speed and spectral values from the ASCE hazard tool, and D100's own tank-specific provisions govern design.

CriterionProvisionHow it applies to a water tower
Velocity pressureASCE 7 Ch. 26, Eq. 26.10-1: qz = 0.00256 KzKztKdKeV²Evaluated at the tank centroid for the vessel and at the tower centroid for the support — the two heights see different Kz.
DirectionalityASCE 7 Table 26.6-1: Kd = 0.90The value for chimneys, tanks, and similar round structures (buildings use 0.85).
Force coefficient, tankASCE 7 Ch. 29 (other structures): Cf ≈ 0.5–0.9 for round tanksDepends on surface roughness and the height/diameter ratio; a smooth cylinder sits near 0.7. Flat-sided appurtenances take higher coefficients.
Seismic design category & spectraASCE 7 Ch. 11: SDS, SD1 from SS, S1 and site classSite-specific mapped values with Fa/Fv site coefficients — the Structural calculator takes SDS and SD1 as inputs for this reason.
Base shear, nonbuildingASCE 7 Ch. 15 (§15.4) with Ch. 12: V = CsW; Cs = SDS/(R/Ie), capped by SD1/(T·(R/Ie))Elevated tanks are nonbuilding structures; R comes from Table 15.4-1 for the support type (braced steel pedestals are commonly designed near R = 3), and the period T follows §12.8 / §15.4 practice for the support system.
Sloshing (not in the calculator)AWWA D100 seismic provisions; Housner (1963) impulsive/convective modelThe water mass splits into an impulsive part moving with the tank and a convective part that sloshes with its own long period. D100 checks freeboard against slosh height — a check beyond this screening tool, stated in its limits.

Foundation Types by Soil Condition

Source: standard geotechnical practice for elevated-tank foundations as summarized in AWWA M42 and Das, Principles of Foundation Engineering. Limits: selection guide only — allowable pressures are planning ranges, and the project geotechnical report sets the actual values, the foundation type, and the settlement criteria. Elevated tanks are settlement-sensitive: differential movement between legs tilts the tank.

Foundation typeSoil condition it fitsTypical allowable bearingNotes
Individual spread footings (one per leg)Firm, uniform soil or weathered rock at shallow depth; low groundwater2,500–4,000+ psfThe classic multi-leg solution — the Foundation calculator's individual mode. Each footing takes one leg's compression, uplift, and shear.
Combined ring wall / full matModerate soils; where individual footings would nearly touch, or differential settlement must be tied together1,500–2,500 psfSpreads the total load and overturning over the whole footprint — the calculator's combined mode. Ring walls suit pedestal tanks.
Drilled piers (caissons) to bearing stratumExpansive clay at the surface over firm bearing material; high water table where excavation stays dry inside a shaftPer pier capacity, by designCommon in Texas expansive-soil country: piers bypass the active zone and are belled or straight-shafted into the bearing layer; uplift resisted by shaft weight, skin friction, and the bell.
Driven piles with pile capsSoft surface soils with a deeper bearing layer; sites where drilled shafts are impracticalPer pile capacity, by designPile groups under each leg or under a mat; uplift piles must be detailed for tension. Load testing or dynamic monitoring verifies capacity.
Ground improvement + matLoose or variable fill, marginal soils where deep foundations price outSite-specificStone columns, rammed aggregate piers, or overexcavation and recompaction raise the allowable pressure and cut differential settlement — verified by the geotechnical engineer, not assumed.